Going Green One Partner At A Time

As a partner in all things energy, we’re doing our part to create a more sustainable energy future, which means finding and creating the best energy mix for TCI.

Our award-winning Utility Owned Renewable Energy (UORE) program is progressing. We continue to fuse more green energy into the grid through rooftop solar photovoltaic systems across the islands. We lease the roof space of qualifying customers to generate solar energy. It’s a hassle-free, zero down program. We cover the investment, installation, maintenance and own the system during its lifetime.

About The Uore Program Explore our Solar Microgrids

TCI Prime Holdings
TCI Prime Holdings

FortisTCI commissioned the grid-tied 168 kW dc system in July 2017 as the company’s first installation and the first distributed solar generation in TCI. The unit produced 920,499 kW hours of solar energy and has avoided 652 metric tons of carbon emissions as at March 2023.

Mills Institute
Mills Institute

The 10.0 kW dc system was commissioned in March 2018 at the private elementary school in Juba Sound, Providenciales. This is one of the smaller rooftop systems under the UORE program. Since installation, it has produced 85,744 kW hours of solar energy as at March 2023, and avoided 60.8 metric tons of carbon emissions.

Global Management (AirCool) – South Building
Global Management (AirCool) – South Building

Located in Cooper Jack, Providenciales, AirCool has two separate rooftop solar systems installed. Our grid-tied 135.2 kW dc unit sits on its South building. The system was commissioned in May, 2018. It has produced 713,748 kW hours of solar energy and avoided 506 metric tons of carbon emissions as at March 2023.

Global Management (AirCool) – North Building
Global Management (AirCool) – North Building

With two buildings on their property in Cooper Jack, Providenciales, our grid-tied 114.4 kW dc unit sits on AirCool North building. Since being commissioned in May 2018, it has produced 551,172 kW hours of solar energy, and avoided 391 metric tons of carbon emissions as at March 2023.

Annette/Roger Pelletier – Residential Project
Annette/Roger Pelletier – Residential Project

Located in West Road, Grand Turk, our grid-tied rooftop 9.8 kW dc unit was commissioned in December 2018. The residential unit has produced over 72,606 kW hours of solar energy, and has avoided 51.5 metric tons of carbon emissions as at March 2023.

Sunflower Oasis Villas - Commercial
Sunflower Oasis Villas - Commercial

Our 13.4 kW dc installed at this commercial property in West Road, Grand Turk was commissioned in December 2018. It has produced over 94,595 kW hours of electricity and avoided 67.0 metric tons of carbon emissions as at March 2023.

Sea Level Ltd. (Caicos Depot)
Sea Level Ltd. (Caicos Depot)

The 353.6 kW dc unit was commissioned at Sea Level (Caicos Depot) building on South Dock, Providenciales in August 2019. The unit has contributed to 1562 metric tons of avoided carbon emissions and produced 2,204,240 kW hours of solar energy as at March 2023.

Carlisle Supplies
Carlisle Supplies

In August 2019, a grid-tied 105.1kW dc solar system atop Carlisle Supplies building, located on the Leeward Highway was commissioned. As of March 2023, the unit has produced 627,490 kW hours of green energy and 445 metric tons of carbon emissions have been avoided.

Grace Bay Car Rental
Grace Bay Car Rental

FortisTCI commissioned a grid-tied 61.3 kW unit atop Grace Bay Car Rental building located on Leeward Highway in August 2019. The unit has produced 324,425 kW hours of solar energy contributing to 230 metric tons of carbon emissions avoided as of March 2023.

Ritz Carlton Resort
Ritz Carlton Resort

Our grid-tied 223.5 kW photovoltaic solar energy system was commissioned atop the resort’s casino in March 2021. The system has produced 734,440 kW hours of solar energy and has avoided 520 metric tons of carbon emissions as of March 2023.

Graceway Sports Centre
Graceway Sports Centre

Our 271.7 kW dc solar system was commissioned at the fitness center in April 2021. Since inception, 870,960kW hours of green energy have been transmitted back to our power grid and 617 metric tons of carbon emissions have been avoided as at March 2023.

Engineering Design Services Limited
Engineering Design Services Limited

The grid-tied 31.2 kW dc system was commissioned in April 2021. The unit has produced over 96,171 kW hours of green energy, contributing to 68.2 metric tons of avoided carbon emissions as of March 2023.

LB Ventures (H20)
LB Ventures (H20)

FortisTCI commissioned a 104.5kW dc system at the resort in April 2021. It has contributed 363,680 kW hours of solar energy to the grid as of March 2023.  258 metric tons of carbon emissions have also been avoided, which contributes to a cleaner environment.  The resort is also home to one of our Electric Vehicle (EV) charging stations, which is a second service that we offer under our renewable energy program.

Salvation Army Corporation – Community Center
Salvation Army Corporation – Community Center

The 15.68 kW dc solar energy system was commissioned in May 2022 at the non-profit organization’s new Community Center on Leeward Highway. It produces 21938 kW hours of solar energy for the grid, and avoids approximately 15.5 metric tons of carbon emissions as at March 2023.

Long Bay Storage
Long Bay Storage

Long Bay Storage has a 308.7kW dc solar energy system installed atop in November 2023 at its storage building, which helps to avoid an 89 metric tons of carbon emissions as at March 2023. The solar energy system has produced 125,564 kW hours of green energy back to our power grid.

Community Fellowship Centre
Community Fellowship Centre

Community Fellowship Center houses a church and school. FortisTCI leased the roof space and commissioned a 185.22kW dc solar energy system in September 2022. The solar energy system has produced 140,000 kW hour of green energy back to our power grid and avoids 103 metric tons of carbon emissions as at March 2023.

Sam’s Club
Sam’s Club

FortisTCI installed a 312.8 kW dc grid-tied solar system atop the grocery wholesaler’s building located on Leeward Highway, Providenciales. The system at Sam’s Club will avoid approximately 317 metric tons of carbon emissions per annum and feed green energy back to the grid once commissioned.

Cargo Express -Tropical Shipping
Cargo Express -Tropical Shipping

FortisTCI leased the 13,000 square foot roof space of Cargo Express/Tropical Shipping’s building on South Dock Road in Providenciales and installed a 207.5 kW dc solar photovoltaic system in December 2022. The system avoids approximately 60.7 metric tons of carbon emissions and system had produced 85,700 kW hours of green energy as at March 2023.